Chapter 11: Waterfront Regeneration

A boat at Leith Docks

Objective:

Priorities

11.1 The decline of port related and industrial activity in waterfront areas and the reduced need for industrial land generally in north Edinburgh has given the city a unique opportunity, a step change above others in the city, to meet its growth needs and set new standards of urban design and sustainability. The sites are among the most significant in Scotland, comparable with other major waterfront sites in Europe. They present opportunities to:

11.2 Overall strategies for development in these areas have been prepared and approved by the Council. These set the vision and the long term framework for development. They provide the context for the preparation of master plans and development briefs dealing with urban design issues for different sites and phases of development, and for the consideration of planning applications. The involvement of local communities has been crucial to the success of these visioning exercises.

11.3 Two areas of change and opportunity are identified on the Proposals Map, the Leith Waterfront area (WAC 1) and the Granton Waterfront area (WAC 2). The Leith Docks Development Framework was prepared in 2005 for the major part of the Leith Waterfront area, in the ownership of Forth Ports. The Granton Master Plan was prepared for the Granton area, which is in the ownership of three separate development companies: Forth Ports, National Grid and Waterfront Edinburgh. Waterfront Edinburgh is a special purpose company, owned by the Council and Scottish Enterprise Edinburgh & Lothian (SEE&L).

Waterfront Areas of Change Policy

11.4 The following policy sets out the key principles, without being too prescriptive: the development programme for these areas may take up to 30 years, and ideas, opportunities and market needs are bound to change over that time, requiring a measure of flexibility.

Policy Wa 1 - Waterfront Areas of Change

Planning permission will be granted for development which will contribute towards the creation of new urban quarters in the Waterfront Areas of Change (WAC 1 and WAC 2). The requirements in principle will be for:

  1. comprehensively designed proposals which maximise the development potential of the area in accordance with agreed development frameworks and/or master plans and the principles of sustainable development
  2. the provision of a series of mixed use sustainable neighbourhoods that connect to the waterfront, with each other and with nearby neighbourhoods in the existing urban area
  3. the provision of modern, high quality office accommodation and industrial and storage accommodation in areas identified primarily for these purposes, and provision of workshop space and accommodation for small businesses more generally distributed in the area
  4. proposals for a mix of house types, sizes and affordability
  5. the provision of retail facilities and leisure and tourism attractions, including water related recreation in and around retained harbours
  6. transport measures agreed with the Council, including a contribution to the proposed tram network and other necessary public transport improvements, the eastwards extension of Ocean Drive and the provision of a network of paths for pedestrians and cyclists, including an east-west path that will form part of the city-wide coastal promenade (safeguarded routes for these are shown on the Proposals Map and Figures 11.1 and 11.2)
  7. the negotiation of financial contributions, or a contribution in kind, for the provision of other measures and facilities made necessary by the development, which could include the provision of additional school places in existing schools, the construction of new schools and the development of new publicly accessible open spaces.

11.5 Regeneration proposals and developer interest are also likely to emerge in the longer term for the one remaining extensive area of commercial uses, between Seafield and Portobello. The principles set out in the above policy will be applied to this area at the appropriate time.

General Principles

11.6 Similar ambitions have informed the strategies and the visions for both Granton and Leith. In both areas there will be:

Leith Waterfront Area of Change

11.7 The Leith Docks Development Framework, (prepared for both Forth ports and the Council, and approved by the Council as supplementary planning guidance in 2005) covers the main, eastern and western, docks area and adjacent land and buildings (WAC 1b). About 170 hectares of land is expected to become available in this area over a period of up to 30 years, as industrial and port-related activities cease or are relocated to other ports around the Forth. Development in Western Harbour (WAC 1a) to the west is proceeding in accordance with comprehensive planning consents within the framework of a design master plan. The Council has prepared a development brief for industrial and disused land at Salamander Place (WAC 1c), an area which will be developed in accordance with the principles agreed for the main docks area.

Figure 11.1 Leith Waterfront - Concept Diagram

Figure 11.1: Leith Waterfront - Concept Diagram

View larger Leith Waterfront map (jpeg, 1188kb)

11.8 The development of these areas will make a major contribution to the city's growth needs: 3,000 homes have been approved for Western Harbour; up to 18,000 are envisaged for Leith Docks. However, the construction of the tram to its projected terminal at Ocean Terminal and its longer term extension to Newhaven and Granton is crucial to the realisation of the area's full potential. Key elements of the vision for the docks area, which will be extended into adjoining areas, are:

Granton Waterfront Area of Change

11.9 The vision and framework provided by the Granton Master Plan seeks to integrate the development activities of three land owner/developers: Forth Ports, National Grid and Waterfront Edinburgh, the last part-owned by the Council. Master plans have subsequently been prepared by each of the land owners for their holdings, and planning applications have been approved. Major infrastructure items have been built, including the main spine road and major developments have been completed for Telford College and Scottish Gas. The total amount of housing approved exceeds 8,000.

Figure 11.2 Granton Waterfront - Concept Diagram

Figure 11.2: Granton Waterfront - Concept Diagram

View larger Granton Waterfront map (jpeg, 185kb)

11.10 Developments will have the same urban, higher density character as for Leith Docks redevelopment, and include: